Continue reading
Description
Specifications
Parameters
Accessories
Feed water enters the unit and passes through the ion exchange resin, causing calcium and magnesium ions to be replaced with sodium ions to produce softened water. Periodically, the exchanged calcium and magnesium are removed from the resin by regeneration using a salt solution supplied from the brine tank. The regeneration process is fully automatic.
Characteristics:
- Reinforced fiberglass cylinder
- Premium grade ion exchange resin
- Automatic timer controls
- Salt container for the production of saline solution (brine)
- Control valves made of corrosion-resistant materials
- Bypass of feed water to the service during regeneration
Accessories:
- Raw water break tank and booster pump
- Soft water storage tank
- Particulate filters (1-50 microns)
- Distribution pipes and valves
- hardness test kit
| Flow rate: (l/hr) | CS10 | CS14 | CS23 | CS30 |
| Maximum service | 300 | 420 | 670 | 1440 |
| Minimum service | 60 | 80 | 120 | 120 |
| Maximum effluent | 240 | 240 | 360 | 500 |
| Regeneration output: (liters) | ||||
| Feed water TH =
200mg/l (as CᵃCO3) |
2700 |
3800 |
6300 |
8600 |
| Feeding water TH =
350mg/l (as CᵃCO3) |
1500 |
2200 |
3600 |
4900 |
| Regeneration: | ||||
| Salt used (kg) | 1.6 | 2.2 | 3.6 | 4.8 |
| Salt capacity (kg) | 25 | 40 | 50 | 65 |
| Time (mins) | 82 | |||
| Connections (inches) | ||||
| Inlet | 1/2″ Hosetail | 3/4″ | ||
| Outlet | 1/2″ Hosetail | 3/4″ | ||
| Drain | 1/2″ Hosetail | 3/4″ | ||
| Dimensions: (mm) | ||||
| High | 650 | 790 | 1095 | 924 |
| Width | 240 | 320 | ||
| Hondo | 430 | 517 | ||
| Weight: (kg) | ||||
| Weight | 15 | 19 | 28 | 74 |
| Requirements: | |
| Power supply | 240 volts 50Hz single phase |
| Feed water pressure | 2-6 barg (30 to 90 psig) |
| Feed water temperature | 1-49°C |
| Drainage | Adequate drainage at ground level |
Water purification
Water decalcification
Consult
Pide información de Softeners
We want to play an active role in creating a safer and more environmentally respectful future.
Related resources
Continue reading
Mandatory testing for PFAS and total fluoride in packaging starting in August 2026
Continue reading
ASTM includes Eraflash (D7094) for specifying the flash point in Jet A/A-1 fuels.
Continue reading
TOC analytical method in cleaning validations: criteria, limits and robustness of the process
Continue reading
Continue reading
Continue reading